Power Factor Correction

Power Factor Correction: Cutting Demand Charges in a Queensland Plant

Paying for Power You Do Not Use

Most plant managers watch their electricity consumption. Fewer look closely at how their site draws that power, and for larger Queensland businesses that is where a good part of the network bill is decided. A plant with poor power factor pays demand charges for capacity that does no useful work. Correcting it is one of the few energy projects that reduces cost without changing anything about how the plant operates.

This guide explains what power factor is, how Queensland’s network tariffs turn it into money, how correction works and the traps to avoid in a plant full of variable speed drives.

Power Factor in Plain Terms

Three quantities describe the power a site draws.

Real power, measured in kilowatts or kW, does the work: turning motors, heating and lighting.

Reactive power, measured in kVAr, sustains the magnetic fields in motors and transformers. It does no useful work, but the network still has to carry it.

Apparent power, measured in kVA, is the combination of the two, and it is what the supply cables and transformers actually have to deliver.

Power factor is real power divided by apparent power. A power factor of 1.0 means every kVA supplied is doing work. A power factor of 0.75 means a quarter of the capacity being supplied is carrying reactive power around the system.

Why Plants Have Poor Power Factor

Induction motors are the main cause, and factories are full of them. A motor draws reactive power to magnetise itself whether it is loaded or not, so motors that are oversized or running lightly loaded have particularly poor power factor. Transformers, older lighting and welding equipment add to it.

A typical uncorrected manufacturing site sits somewhere between 0.7 and 0.85. That is normal, and it is expensive.

How Queensland Tariffs Turn It Into Money

Large business customers in Queensland have been moving to network tariffs based on kVA since 1 July 2021. Under these tariffs demand is measured in kVA and not in kW, which means poor power factor shows up directly in the demand charge.

In South East Queensland the default tariff for large businesses is Energex’s Large Time of Use Demand and Energy tariff, network tariff code 7200. Demand is measured as the single highest 30 minute kVA demand within the charging window each month, and charged per kVA.

The time windows matter. The peak window is 5pm to 8pm on weekdays. The shoulder window is 1pm to 5pm and 8pm to 11am on weekdays, and 1pm to 11am on weekends. Off peak is 11am to 1pm every day.

Two features of this structure are worth understanding. First, a single half hour sets the demand charge for the whole month. One coincidence of large motors starting can cost as much as a month of steady running. Second, Queensland demand resets every month, unlike networks that carry a peak forward for a year, so an improvement made this month shows on the next bill.

A Worked Example

Take a plant whose real load in its peak half hour is 375 kW.

At a power factor of 0.75, apparent power is 375 divided by 0.75, which is 500 kVA. That is what the demand charge is calculated on.

Correct the power factor to 0.98 and the same 375 kW requires 375 divided by 0.98, which is 383 kVA.

The difference is 117 kVA, a reduction of about 23 per cent in billed demand, with no change to production, hours or output. Multiply that by the per kVA rate on your own bill and by twelve months to see what it is worth to your site.

This article deliberately quotes no dollar rate. Network prices are published in the distributor’s price list, change every July and are passed through by retailers in different ways. Use your own invoices.

How Correction Works

Capacitors supply reactive power locally, so the motors draw it from the capacitor bank and not from the network. The plant’s kW stays the same and its kVA falls.

Central automatic correction. A capacitor bank at the main switchboard, switched in steps by a controller that follows the load. This is the usual solution for a plant with varying load.

Group correction. Smaller banks at distribution boards or motor control centres. This also frees capacity in the cables between the main switchboard and the load.

Fixed correction at a motor. A capacitor connected with one large, steadily running motor.

The target is usually around 0.95 to 0.98. Chasing 1.0 costs more than it returns, and over correction creates problems of its own. Too much capacitance at light load pushes the power factor leading, which can raise voltage and may itself increase kVA.

The Harmonics Trap

This is where correction projects go wrong in modern plants. Variable speed drives, switch mode power supplies and LED lighting draw current in a distorted pattern and produce harmonics. Capacitors and the inductance of the supply system form a circuit that can resonate at a harmonic frequency. When that happens, harmonic currents are amplified, capacitors overheat and fail, fuses blow and drives trip.

The solution is detuned correction. Reactors are fitted in series with the capacitors so that the bank cannot resonate at the harmonics present on the site. It costs more than a plain capacitor bank and it is the difference between a system that lasts and one that fails within a year or two.

No correction equipment should be specified for a plant with a significant drive population until harmonics have been measured.

Drives Change the Picture

A motor fed through a variable speed drive presents a good power factor to the supply at the fundamental frequency, because the drive supplies the motor’s reactive power from its own circuitry. As a plant adds drives, its need for correction on those motors falls while its harmonic levels rise. A correction system sized years ago for a plant of direct on line motors may now be oversized, mistuned or both.

Demand Is Also About Timing

Power factor reduces the kVA of whatever load is running. The other lever is how much is running at once. Because one half hour sets the monthly charge, it is worth looking at what happens in your peak window. Staggering the start of large motors, shifting a batch process or a CIP heating cycle away from the 5pm to 8pm peak, and avoiding simultaneous restarts after a stoppage can all trim the peak at no capital cost.

Capacitor Banks Need Maintenance

Correction equipment is often installed and forgotten. Capacitors lose capacity with age and heat, fuses fail and contactors wear, and a bank can quietly drop to half its rating while the plant goes on paying for demand it thought it had removed. Check the power factor on the bill, inspect the bank annually and include it in thermal imaging surveys.

Steps to a Decision

Get twelve months of interval data from your retailer or meter provider. Identify your tariff and how demand is measured. Find your monthly peak kVA and the power factor at the time of each peak. Have power quality measured at the main switchboard, including harmonics. Size the correction and choose detuned equipment where harmonics require it. Compare the installed cost with the annual demand saving. For a plant at 0.75 to 0.8 on a kVA tariff, payback is often short, but it should be calculated and not assumed.

Where BevTech Fits

BevTech is a family owned engineering business in Richlands, Brisbane, with more than 25 years in beverage and FMCG manufacturing. Our industrial electricians carry out electrical condition audits, switchboard modifications and installations to AS/NZS 3000, and install and commission variable speed drives on Allen Bradley and Siemens controlled lines. We can inspect and maintain existing correction equipment as part of a planned maintenance visit, and help you establish what your site is actually drawing before you spend money on new equipment.

If your demand charges look high for what your plant produces, use the contact form at simonb307.sg-host.com/contact.

This article is a general guide current as at October 2026. Tariff structures and windows are set by the distributor and can change, so confirm the details that apply to your connection with your retailer.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

@Fd2X@HoSi10178
Shutdown Checklist
Bevtech fmcg beverage shutdown planning checklist glass.webp0000

Get Your FMCG & Beverage Plant Shutdown Planning Checklist

We wont spam you :) or share your details.
We will send you an email with the PDF checklist.