The Electrical Hazard That Does Not Need Contact
Most people think of electrical danger as electric shock: touch something live and current passes through you. Arc flash is different, and in an industrial plant it can be worse. An arc flash is an explosive release of energy when current jumps through the air between conductors or from a conductor to earth. It produces intense heat, a blast of pressure, molten metal and blinding light, and it can cause severe burns to someone standing in front of a switchboard who has touched nothing.
This guide explains how arc flash arises in food and beverage plants, what the current Australian standards and Queensland rules say, and how to reduce the risk in ways that go well beyond protective clothing.
What Causes an Arc Flash
An arc starts when the insulation or air gap between energised parts breaks down. Common triggers include a dropped tool or loose hardware bridging conductors, a failed component, contamination and moisture, corrosion, loose connections that overheat, vermin, and switching or racking equipment that is worn or faulty.
Three things decide how severe the event is. The first is the fault current available at that point in the system. The second is how long the protection takes to clear the fault. The third is how far away the person is. The energy a person receives rises with fault current and with clearing time, and falls quickly with distance.
The middle factor surprises people. A slow protective device on a moderate fault can produce more energy than a fast one on a larger fault. Much of the engineering work on arc flash is about clearing time.
Where the Risk Sits in a Food or Beverage Plant
The highest energy is generally found closest to the supply: main switchboards, the incoming sections of motor control centres and large distribution boards. Risk rises during particular tasks, including switching and racking circuit breakers, removing and fitting covers, fault finding on energised equipment and working near exposed busbars.
Food and beverage sites add conditions of their own. Washdown and humidity find their way into enclosures. Sugar, flour and product dust settle on insulation. Caustic and acid cleaning chemicals attack metalwork. Many plants have grown in stages, with switchboards extended and loaded beyond what the original design allowed and protection settings that nobody has reviewed since.
The Standards That Apply
AS/NZS 4836:2023 is the current standard for safe working on or near low voltage and extra low voltage electrical installations and equipment. It supersedes the 2011 edition, which is still quoted in many site procedures. The 2023 edition expanded its guidance on personal protective equipment and added a PPE selection table, Table 11.2. It also provides that an arc fault study may supersede the guidance in that table, which means a site that has calculated its actual incident energy can base its PPE on those results.
AS/NZS 3000:2018, the Wiring Rules, governs the installation itself.
ENA NENS 09-2014 is the national guideline for the selection, use and maintenance of personal protective equipment for electrical arc hazards.
IEEE 1584-2018 is the internationally used method for calculating arc flash incident energy and is the basis of most arc flash studies.
If your site procedures refer to AS/NZS 4836:2011, they are out of date and should be reviewed against the current edition.
What Queensland Law Says About Live Work
The most effective arc flash control is to work on equipment that is not energised, and Queensland’s rules start from that position. Under the Electrical Safety Act 2002 and the Electrical Safety Regulation 2026, electrical work on or near energised electrical equipment is generally prohibited. Near means within 3 metres of an exposed energised part.
There are four circumstances in which energised work is permitted: where it is necessary in the interests of health and safety, where the equipment must be energised for the work to be carried out properly, where testing is needed to determine whether the equipment is energised, and where there is no reasonable alternative.
Production pressure is not on that list. A line that needs to keep running does not make live work lawful.
Where energised work is permitted, conditions apply. They include a risk assessment, a safe work method statement, testing by a competent person, control of the work area, appropriate protective equipment, tools and test instruments, consultation with the person who manages or controls the workplace, and a safety observer unless the work is testing only and the risk assessment shows no serious risk.
The regulation was restructured in 2026 and its section numbers changed, although the Electrical Safety Office has said the obligations themselves did not. Site documents that quote sections of the 2013 regulation need updating.
What an Arc Flash Study Involves
An arc flash study replaces assumptions with numbers. It has five stages.
Data collection. The single line diagram is verified against the site, and details are gathered for the supply, transformers, cables and every protective device with its settings.
Fault level calculation. The prospective fault current is calculated at each switchboard.
Protection review. The time each protective device would take to clear an arcing fault is determined, and coordination between devices is checked.
Incident energy calculation. The energy a person would receive at a working distance is calculated for each location, along with the boundary inside which protection is needed.
Labels and recommendations. Each switchboard is labelled with its incident energy and PPE requirement, and the report recommends changes that would reduce the energy.
The last stage is the most valuable. A good study does not only tell you what to wear. It tells you which protection settings to change so that you need to wear less.
Reducing the Risk, in Order of Effectiveness
Eliminate. De-energise before work. Plan maintenance so that switchboard work is done in shutdowns with the supply isolated.
Reduce the energy by design. Review protection settings so faults clear faster. Fit maintenance mode switches that temporarily speed up protection while people are working. Consider arc flash detection relays that sense light and trip in milliseconds. Specify arc fault contained switchgear for new and replacement boards.
Increase the distance. Remote switching and remote racking move the person out of the blast zone entirely.
Maintain the equipment. Thermal imaging, cleaning, checking terminations and keeping enclosures sealed against moisture and dust remove many of the triggers.
Administer. Labels, procedures, training, permits and exclusion zones.
Protect the person. Arc rated clothing, face protection and gloves selected for the incident energy at that location. PPE is the last line and it limits injury. It does not prevent the event.
Questions to Ask About Your Own Site
Do we have a current single line diagram? Has the fault level at our main switchboards been calculated since the last supply upgrade? When were protection settings last reviewed? Are our switchboards labelled with arc flash information? Do our procedures cite the 2023 edition of AS/NZS 4836 and the 2026 regulation? How often is live work done here, and under which of the four exceptions? Is the PPE on site matched to calculated energy, or chosen by habit?
If several of those cannot be answered, the plant does not know its arc flash risk, and the place to start is the single line diagram.
Where BevTech Fits
BevTech is a family owned engineering business in Richlands, Brisbane, with more than 25 years in beverage and FMCG manufacturing. Our industrial electricians carry out condition audits of site electrical systems, switchboard modifications and electrical installations to AS/NZS 3000, and we produce the electrical drawings that any study depends on. We plan switchboard work into shutdowns so that it is done with the supply isolated, and we provide 24/7 breakdown support across Brisbane and South East Queensland.
If your site has no current single line diagram or you are unsure what state your switchboards are in, use the contact form at simonb307.sg-host.com/contact.
This article is a general guide current as at October 2026 and is not a substitute for a site specific assessment. Confirm the requirements for energised work with the Electrical Safety Office.